So Decided to paint my chrome pipe. I think it turned out pretty good but when I took off the tape a little bit of the paint came off with it. I'm going to try again with a smaller strip of tape. Oh yea, I used some sort of high temp grill paint.
Wednesday, August 11, 2010
Prepping the frame for sandblasting
I did some cutting and grinding on the frame, I want to cut off all the extra tabs and brackets that I won't be using. I still have some grinding left, but i was happy with the work completed.
Parts Ordered
Thanx to
Description | Quantity | Price | |
Puch E50 Green Seal Kit | 1 | $9.99 | |
Puch Crankshaft Bearing Set | 1 | $16.99 | |
Puch E50 Gasket Kit | 1 | $10.99 | |
Puch Race Alu Stuffed Crank | 1 | $106.00 | |
Puch Cheapo 70cc Kit | 1 | $77.00 |
I also picked up some new engine bolts from Fastenal
The e50 has been opened
After having a hell of a time getting the stripped screws out (thanx Bill) of the engine casing and a little cleaning this is how I ended the night. Now I need to get a clutch puller.
POS SCREWS!!!
The E50 Engine
Well the engine is out and ready to be disassemble and cleaned. Most of the parts will be replaced with upgraded parts. Let the ordering begin.
What I'm starting with.
After taking off the seat, busted controls and wiring this is what i'm starting with. Not much to look at right now but I can see the diamond in the rough.
Subscribe to:
Posts (Atom)